As you probably have noticed since the creation of the Alleluia Fund in May of 2021, many updates and improvements have been happening here at The Church of St. Michael & St. George. The Alleluia Fund is an ongoing fundraising campaign to provide money for projects outside the Church’s regular operating budget. As of November 20, 2024 the Alleluia Fund has raised 831,478.10. Funding for the projects helps us continue to strengthen both our physical and spiritual Episcopal identity. We strive to preserve and improve our church building as we expand our efforts to welcome and minister to our parishioners and to our community for generations to come. If you have questions about contributing to The Alleluia Fund or other stewardship efforts at CSMSG, please reach out to Alexis Posnanski, Director of Stewardship and Giving at 314.721.1502, ext.4044 or aposnanski@csmsg.org. Thank you for sharing God’s abundance with CSMSG!
GIVE TO THE ALLELUIA FUND
Completed 2024
-
Hired a Facilities Manager
-
Purged and downsized offsite storage area
-
Repaired Rev. Peter Speropulos’ garage roof
-
Lead glass repairs for exterior windows (front-facing school windows)
-
Leak repair in the Great Hall
-
Fire panel installed
-
Comprehensive maintenance of fire protection system, including emergency lighting and building-wide power backup solution
-
Video switch component installed for the Great Hall
-
Ceiling repair, painting, and patching throughout the building
-
Church boiler repair
-
New women’s restroom toilets and sink
-
Additional small repair items
Completed 2023
-
Repaired irrigation system and planted new grass seed
-
Purchased new portable stage
-
Guttering repairs over the Nave
-
Installed new carpet in the Great Hall and polished/restored wood flooring
-
Applied special polish to wood in the Nave and St. Mary’s Chapel
-
Plaster repairs in the Tower and Andrew’s office; purchased new dishwasher
-
Lateral sewer repair under school playground
-
Fire alarm panel installed for the building
-
Camera system repaired and brought back online
-
Window restoration and repairs
-
Brickwork following Clayton sidewalk replacement
-
School roof repairs
-
CAT5 network cable upgrade
-
LED lightbulb upgrade in the church
-
Re-stripped and restored church tile
-
St. Mary’s ceiling plaster repair and painting
-
Hallway TV monitor installation
-
Tuckpointing repairs
-
Plumbing repairs
-
HVAC unit replacements
-
Wydown exterior stair repair (school’s main entrance)
-
Landscaping projects for clergy residences and church grounds
Completed 2022
-
Phone system installation
-
Landscaping improvements
-
IT improvements
-
HVAC improvements and repairs
-
Church roofing systems
-
Interior drain repairs
-
Exterior door replacements and repairs
-
Tuckpointing
-
Various plaster repairs
-
Various painting projects
-
Rectory gutter and painting repairs
-
Check-in system for church school
-
Purchased camera and video recording equipment
-
Narthex window and plaster repair
-
Sound improvements for processional/recessional microphone
-
Installed outdoor electrical outlet for food trucks